M/s Andhra Pradesh Gas Distribution Corporation Ltd. (M/s APGDC) intends to lay approx 178 km long (18”/12”/8”/4”) natural gas cross country steel pipeline under Phase-1 of Kakinada- Srikakulam Pipeline Project (KSPL) in the state of Andhra Pradesh for transportation and distribution of re-gasified liquid natural gas (RLNG) to various potential/ prospective consumers along the pipeline route. The KSPL Phase-1 network will connect different consumers such as Kakinada SEZ, Essar Steel, AP Petroleum, HPCL Vizag etc. along the pipeline in the state of Andhra Pradesh..

Project Description

Project Name : Kakinada-Srikakulam Pipeline Project (Phase-I)Section II
Project Length : 81.8 km (Approx.)
Material Specification : API 5L Gr X-70 PSL-2, API 5L Gr X-56 PSL-2 & API 5L Gr X-42 PSL-2.
Diameter : 18”/12”/8”/4”
Wall Thickness (mm) : 12.7, 8.7 , 9.5, 7.9 & 6.4 mm
Coating : 3LPE
Client : M/s Andhra Pradesh Gas Distribution Corporation Ltd. (APGDC)
Consultant : M/s Mecon Limited
Contractor : KALPATARU POWER TRANSMISSION LIMITED (KPTL)
PIMS : Unistal Systems Pvt. Ltd.
Start Date : 23-June-18
End Date : 22-SEP-19
Website Configuration Date :  
Section Details
Section From To Section Length(Km.) Remark
18-inch IP -02 IP -03 71.06 KM
12-inch IP -03 HPCL VIZAG 02.83KM
8- INCH TAP OFF POINT-03 Essar Steel 05.26KM
4- INCH TAP OFF POINT-05 Andhra Petrochemicals 02.14KM
Route Map
Route Map of KSPP)
Schematic Diagram
Schematic Diagram p of KSPP)